The Engineering Department recommends the City of Plano entering into an Interlocal Agreement with the NTMWD for the new connection of a sewer line at the NTMWD lift station located at the southern end of Accent Drive. The City of Plano’s current connection will be abandoned and replaced with a new connection as a part of sewer line capacity improvements along President George Bush Turnpike. The proposed replacement of the existing line will require a new connect to the NTMWD sewer lift station.
NTMWD and City staff have prepared an Interlocal Agreement to memorialize and guide future cooperative efforts between the two entities for this connection.
If this Interlocal Agreement is not approved, Plano will be unable to make the new connection and unable to make needed capacity improvements to the existing sewer line.